Kenneth R. Baker
22 catalog papers. Identity-linked publications and additional name matches are distinguished below.
ORCID: 0000-0003-3124-3454
Tuck School of Business, Dartmouth College, Hanover, New Hampshire 03755
Publications
- An Optimal Contact Model for Maximizing Online Panel Response Rates — Management Science 2009
- Scheduling Groups of Jobs on a Single Machine — Operations Research 1995
- Optimal Allocation of Work in Assembly Systems — Management Science 1993
- Basic Techniques for Lot Streaming — Operations Research 1993
- Sequencing with Earliness and Tardiness Penalties: A Review — Operations Research 1990
- The Effect of Commonality on Safety Stock in a Simple Inventory Model — Management Science 1986
- Safety stocks and component commonality — Journal of Operations Management 1985
- The effects of input control in a simple scheduling model† — Journal of Operations Management 1984
- Sequencing Rules and Due-Date Assignments in a Job Shop — Management Science 1984
- Preemptive Scheduling of a Single Machine to Minimize Maximum Cost Subject to Release Dates and Precedence Constraints — Operations Research 1983
- Job shop scheduling with modified due dates — Journal of Operations Management 1983
- The Bond Scheduling Problem of the Multi-Subsidiary Holding Company — Management Science 1982
- A dynamic priority rule for scheduling against due-dates — Journal of Operations Management 1982
- An investigation of due-date assignment rules with constrained tightness — Journal of Operations Management 1981
- An Analytic Framework for Evaluating Rolling Schedules — Management Science 1979
- Dynamic Programming Solution of Sequencing Problems with Precedence Constraints — Operations Research 1978
- Finding an Optimal Sequence by Dynamic Programming: An Extension to Precedence-Related Tasks — Operations Research 1978
- Workforce Scheduling with Cyclic Demands and Day-Off Constraints — Management Science 1977
- Technical Note—An Elimination Method for the Flow-Shop Problem — Operations Research 1975
- A Comparative Study of Flow-Shop Algorithms — Operations Research 1975
- Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements — Management Science 1974
- Note—On Madigan's Approach to the Deterministic Multi-Product Production and Inventory Problem — Management Science 1970