Scholion.ai

A punched card procedure for use with the method of paired comparisons

Kephart, N. C., Oliver, James E.

Journal of Applied Psychology · 1951 · Volume 36 · Issue 1

DOI: 10.1037/h0061734

Abstract

A step-by-step procedure for setting up paired comparison materials applied to ratings of workers on job performance is described here. This kind of task (25 names in variable list, which means a deck of 300 pairs that must be produced) takes an experienced operator 40 minutes to complete, including the scoring subsequent to the preparation. If a typewriter were used to prepare the pairs, 12 to 16 hours of clerical labor would be required in preparation and scoring. (PsycInfo Database Record (c) 2025 APA, all rights reserved)

Enable JavaScript for citation tools and additional paper interactions.