The Economic Design ofXCharts Used to Maintain Current Control of a Process
Journal of the American Statistical Association · 1956 · Volume 51 · Issue 274
DOI: 10.1080/01621459.1956.10501322
Abstract
This paper establishes a criterion that measures approximately the average net income of a process under surveillance of an X chart when the process is subject to random shifts in the process mean. The quality control rule assumed is that an assignable cause is looked for whenever a point falls outside the control limits. The criterion is for the case in which it is assumed that the process is not shut down while the search for the assignable cause is in progress, nor is the cost of adjustment or repair and the cost of bringing the process back into a state of control after the assignable cause is discovered charged to the control chart program. The paper shows how to determine the sample size, the interval between samples, and the control limits that will yield approximately maximum average net income. Numerical examples of optimum design are studied to see how variation in the various risk and cost factors affects the optimum. * The writer is greatly indebted to I. R. Savage and G. Greggory of Stanford University for their criticism and suggestions in preparation of this paper. The paper was completed while the writer was working at Stanford University under the auspices of the Office of Naval Research.
Enable JavaScript for citation tools and additional paper interactions.