Scholion.ai

Analysis of Stochastic Assembly with GI-Distributed Assembly Time

W. E. Wilhelm, Pradip Som

INFORMS Journal on Computing · 1999 · Volume 11 · Issue 1

DOI: 10.1287/ijoc.11.1.104

Abstract

In this article, we study an assembly system that supplies an end-product inventory. We allow assembly operation times to be general, independent (GI) distributed and analyze the system as a Markov renewal process, deriving a closed-form expression for long-run Palm probabilities of both kit and end-product inventory positions. We then present a numerical procedure to obtain various performance measures using the matrix-geometric approach. Finally, we describe insights about the operation of the assembly system that are made possible by our analysis, in particular, showing the effects of kit buffer capacity on kit and end-product inventory positions.

Keywords

manufacturing, Markov renewal process, queues, assembly system operation, matrix-geometric numerical solution, tandem

Enable JavaScript for citation tools and additional paper interactions.