Single Machine Scheduling to Minimize Total Weighted Late Work
A. M. A. Hariri, C. N. Potts, L. N. Van Wassenhove
ORSA Journal on Computing · 1995 · Volume 7 · Issue 2
Abstract
In the problem of scheduling a single machine to minimize total weighted late work, there are n jobs to be processed for which each has an integer processing time, a weight and a due date. The objective is to minimize the total weighted late work, where the late work for a job is the amount of processing of this job which is performed after its due date. An O ( n log n ) algorithm is derived for the preemptive total weighted late work problem. For non-preemptive scheduling, efficient algorithms are derived for the special cases in which all processing times are equal and in which all due dates are equal. A pseudopolynomial algorithm is presented for the general non-preemptive total weighted late work problem. Also, a branch and bound algorithm in which lower bounds are obtained using the dynamic programming state-space relaxation method is proposed for this general problem. Computational results with the branch and bound algorithm for problems with up to 700 jobs are given. INFORMS Journal on Computing , ISSN 1091-9856, was published as ORSA Journal on Computing from 1989 to 1995 under ISSN 0899-1499.
Keywords
scheduling, single machine, weighted late work, branch and bound algorithm
Enable JavaScript for citation tools and additional paper interactions.