Integrated Sequencing and Scheduling in Coil Coating

Wiebke Höhn, Felix G. König, Rolf H. Möhring, Marco E. Lübbecke

Management Science · 2011 · Volume 57 · Issue 4

DOI: 10.1287/mnsc.1100.1302

Abstract

We consider a complex planning problem in integrated steel production. A sequence of coils of sheet metal needs to be color coated in consecutive stages. Different coil geometries and changes of colors necessitate time-consuming setup work. In most coating stages one can choose between two parallel color tanks. This can either reduce the number of setups needed or enable setups concurrent with production. A production plan comprises the sequencing of coils and the scheduling of color tanks and setup work. The aim is to minimize the makespan for a given set of coils. We present an optimization model for this integrated sequencing and scheduling problem. A core component is a graph theoretical model for concurrent setup scheduling. It is instrumental for building a fast heuristic that is embedded into a genetic algorithm to solve the sequencing problem. The quality of our solutions is evaluated via an integer program based on a combinatorial relaxation, showing that our solutions are within 10% of the optimum. Our algorithm is implemented at Salzgitter Flachstahl GmbH, a major German steel producer. This has led to an average reduction in makespan by over 13% and has greatly exceeded expectations. This paper was accepted by Dimitris Bertsimas, optimization.

Keywords

sequencing, scheduling, integrated steel production, coil coating, 2-union graphs, independent set, branch-and-price

Enable JavaScript for citation tools and additional paper interactions.