Scholion.ai

Scheduling Maintenance and Determining Crew Size for Stochastically Failing Equipment

R. C. Vergin

Management Science · 1966 · Volume 13 · Issue 2

DOI: 10.1287/mnsc.13.2.b52

Abstract

Past treatment of the single machine maintenance problem has shown that preventive maintenance may be desirable for equipment for which failures are caused at least partially by wear-out factors. In all previous treatment, however, the size of the maintenance-repair crew has been held constant and the optimal maintenance period has then been determined. This paper develops a simultaneous solution for the maintenance-repair crew size and the optimal maintenance period. The optimal maintenance period is seen to shift as the size of the maintenance-repair crew varies. For the multi-machine maintenance problem, the sharing of the maintenance-repair crew creates a queuing system. Because of its complexity, an analytical solution of this multi-machine maintenance queuing system is not feasible. A simulation model was used to develop a set of general rules for scheduling maintenance for the multi-machine case.

Enable JavaScript for citation tools and additional paper interactions.