Scholion.ai

Note—A Node Elimination Procedure for Townsend's Algorithm for Solving the Single Machine Quadratic Penalty Function Scheduling Problem

P. C. Bagga, K. R. Kalra

Management Science · 1980 · Volume 26 · Issue 6

DOI: 10.1287/mnsc.26.6.633

Abstract

In this note, a node elimination procedure has been suggested in case the two sequences obtained by using Townsend's (Townsend, W. 1978. The single machine problem with quadratic penalty function of completion times: A branch and bound solution. Management Sci. 24 (5) 530–534.) sufficient conditions for solving the single machine quadratic penalty function scheduling problem contain a subset J r of r jobs in the first r positions. Numerical illustrations and computational experience has been given in the end.

Keywords

production/scheduling, programming: integer algorithms, branch and bound

Enable JavaScript for citation tools and additional paper interactions.