Scholion.ai

Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems

John Miltenburg

Management Science · 1989 · Volume 35 · Issue 2

DOI: 10.1287/mnsc.35.2.192

Abstract

Mixed-model assembly lines are used to produce many different products without carrying large inventories. The effective utilization of these lines requires that a schedule for assembling the different products be determined. For Just-In-Time (JIT) production systems, which require producing only the necessary products in the necessary quantities at the necessary times, the objective is to keep a constant rate of usage of all parts used by the line. This is called levelling or balancing the schedule. This paper develops a theoretical basis for scheduling these systems, and presents new scheduling algorithms and heuristics.

Keywords

production/scheduling: line balancing, inventory/production: just-in-time, facilities/equipment planning

Enable JavaScript for citation tools and additional paper interactions.