Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
Management Science · 1993 · Volume 39 · Issue 3
Abstract
One of the necessary and sufficient conditions derived by F. F. Boctor (1982) for feasibility of a repetitive two-product schedule is that the cycle times ( T 1 and T 2 ) must be integer multiples of some time interval T (Propositions 2, 3 and 4). This result also holds for N -product schedules. However, the proof for Propositions 3 and 4 in [1] is not exactly valid and therefore a correction has to be made.
Enable JavaScript for citation tools and additional paper interactions.