Scholion.ai

Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem

Chen Shaoxiang

Management Science · 1993 · Volume 39 · Issue 3

DOI: 10.1287/mnsc.39.3.387

Abstract

One of the necessary and sufficient conditions derived by F. F. Boctor (1982) for feasibility of a repetitive two-product schedule is that the cycle times ( T 1 and T 2 ) must be integer multiples of some time interval T (Propositions 2, 3 and 4). This result also holds for N -product schedules. However, the proof for Propositions 3 and 4 in [1] is not exactly valid and therefore a correction has to be made.

Enable JavaScript for citation tools and additional paper interactions.