Letter to the Editor—Timing of Check Out Before a Critical Event
Operations Research · 1965 · Volume 13 · Issue 6
Abstract
A system with constant failure rate must be operable at time T . Prior to this we permit only one check-out, and one repair if necessary. How far should we “back off” from T in scheduling check out? Approximate solutions are derived for exponential and log normal repair time distributions, with graphical results in the latter case.
Enable JavaScript for citation tools and additional paper interactions.