Scholion.ai

Minimizing Total Costs in One-Machine Scheduling

A. H. G. Rinnooy Kan, B. J. Lageweg, J. K. Lenstra

Operations Research · 1975 · Volume 23 · Issue 5

DOI: 10.1287/opre.23.5.908

Abstract

Suppose we have n jobs that arrive simultaneously to be processed on a continuously available machine that can handle only one job at a time. Each job has a fixed processing time and a cost function that is nondecreasing in its finishing time. We want to find a schedule that minimizes total costs. After reviewing the relevant work on this problem, we present a new algorithm for a general cost function. The algorithm is tested for the well known case of a weighted tardiness criterion.

Enable JavaScript for citation tools and additional paper interactions.