Scholion.ai

Technical Note—Three-Stage Flow-Shops with Recessive Second Stage

Fennell Burns, John Rooker

Operations Research · 1978 · Volume 26 · Issue 1

DOI: 10.1287/opre.26.1.207

Abstract

Several papers have described special structural properties for which the minimum makespan flow-shop problem can be efficiently solved. We describe a new special case of the 3 × n problem with small second-stage processing times relative to the first and third stages for which Johnson's algorithm gives an optimal schedule.

Enable JavaScript for citation tools and additional paper interactions.