Scholion.ai

A Note on Heuristics of Flow-Shop Scheduling

Tsung-Chyan Lai

Operations Research · 1996 · Volume 44 · Issue 4

DOI: 10.1287/opre.44.4.648

Abstract

We present an O ( mn ) two-group (TG) heuristic for the m -machine, n -job permutation flow-shop scheduling problem. We show that heuristic TG has a worst-case performance ratio of ( m + 1)/2. We also establish worst-case bounds for several heuristics proposed in the past.

Keywords

heuristic, worst-case analysis, scheduling, flow-shop sequencing

Enable JavaScript for citation tools and additional paper interactions.