Scholion.ai

Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines

John J. Bartholdi, III, Leonid A. Bunimovich, Donald D. Eisenstein

Operations Research · 1999 · Volume 47 · Issue 3

DOI: 10.1287/opre.47.3.488

Abstract

We describe all possible asymptotic behavior of “bucket brigade” production lines with two or three workers, each characterized by a constant work velocity. The results suggest wariness in interpreting simulation results. They also suggest a strategy for partitioning a workforce into effective teams to staff the lines.

Keywords

production/scheduling, line balancing, self-balancing bucket brigade lines, mathematics, fixed points, asymptotic behavior of bucket brigade lines

Enable JavaScript for citation tools and additional paper interactions.